woolybug25
#1 Vineyard Vines Fan
- Messages
- 17,677
- Reaction score
- 3,018
Great now where am I going to attempt this slide??
![]()
This is horrid...
Great now where am I going to attempt this slide??
![]()
Are you 14?
Great... now I have to wait forever to piss just because Koon is scared that someone will see his nubbins.
I'm trying to picture how pissed off the Blue Bloods will be over this...
hope the scoreboard is being saved and installed somewhere cool, always neat when that is done
I hope they install it at Corby's so the bartenders can keep track of the number of beers I'm going to drink there next weekend.
You're gonna be in town next week?
You're mom coming too?
hope the scoreboard is being saved and installed somewhere cool, always neat when that is done
Wouldn't it be cool if they donated it to a local high school? Okay, maybe a bit big for that venue, but I'd take it.
The Jumbotron is going in on the side opposite of section 1 correct?
I hope they install it at Corby's so the bartenders can keep track of the number of beers I'm going to drink there next weekend.
Plz that thing is a high school scoreboard
Will never understand why ND will spend $400 million+ on a renovation and won't cover the concrete so that it matches the brick on the new sections. Looks dumb
I'm 74% sure there will be another project 15-20 years down the road that's going to add on multi-story "stacks" of buildings that connect each of the three larger Crossroads buildings.
I figured the next project would have a similar loom to the latest Lambeau renovation.
Also, here's a quick recap of the renovation:
https://www.18stripes.com/crossroads-is-coming-university-of-notre-dame-400-million-stadium-upgrade/
I feel like a lot of people think a video board, premium seats, and "some academic stuff" are the only things being added. In reality, the scope is pretty amazing. They've basically created a new stadium, especially inside the guts of the stadium, without having to start over from scratch.
The stadium is now a hideous bauble that isn't worth much...appropriate for the current era of ND football, I'm afraid.
The stadium is now a hideous bauble that isn't worth much...appropriate for the current era of ND football, I'm afraid.
The stadium is now a hideous bauble that isn't worth much...appropriate for the current era of ND football, I'm afraid.
The restrooms are being renovated and additional women’s bathrooms being created.
The concession stands are going to be improved.
A couple of thoughts....
1) The last concepts they showed had the corners re-bricked to match the new Crossroads brick. So this would be the gate areas. You can see it here:
![]()
If you look closely at the '97 renovation there was some brick used that is virtually the same used for Crossroads but it's faded and surrounded by too much cement to stand out. Judging by the current construction progress I think they will be waiting until after the season to re-brick the gate areas. Once they do that it'll look much nicer.
2) They didn't do anything about the exposed concrete of the upper bowl in the corners, which is what you may have been referencing. I'm 74% sure there will be another project 15-20 years down the road that's going to add on multi-story "stacks" of buildings that connect each of the three larger Crossroads buildings.
The stadium is now a hideous bauble that isn't worth much...appropriate for the current era of ND football, I'm afraid.